Delta Lloyd v Witsen (in re Kontiki): On the relevance of tidiness in GTCS.

Thank you Stefanie Roosen for flagging the issue in what after a bit of searching I take it to be Delta Lloyd v Witsen. At issue is not immediately a conflict of laws concern however the case does highlight a discussion often occurring with respect to choice of court and choice of law: when do mere references to general terms and conditions (GTCS) become binding upon parties, all the more so when these refer to industry standards. Here: HISWA standards, the ‘Nederlandsche Vereeniging voor Handel en Industrie op het Gebied van Scheepsbouw en Watersport’ est.1932.  The Netherlands are a seafaring nation: HISWA is big.

During repairs to the yacht Kontiki, the rear cable of the shipyard’s portal crane broke, the Kontiki fell and she suffered severe damage. The shipyard had in the course of negotiation, agreement and confirmation referred to no less than three different HISWA sets. The Rechtbank Noord-Holland held that as a result, none was validly incorporated into the contract (neither incidentally was a mere sign quayside, limiting liability).

As I have reported on this blog before (e.g. here), there is no magic wand when it comes to GTCS: all that is required is due diligence. Neat filing and dito reference. Electronically or otherwise: it is elementary for all things legal.

Geert.

(Handbook of) EU Private International Law, 2nd ed. 2016, Chapter 2, Heading 2.2.9.3.1.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.